Gate Infrastructure
Auto weighing System to comply with Verified Gross Mass (VGM)
Container Entrance Gate-in (8) lanes (Terminal Gate-1)
Container Exit Gate-out (8) lanes (Terminal Gate-2)
Specific Access Gate-in & Gate-out for OOG
Documents Verification
Perform as Administrative function
Check the required documents of Import & Export sea shipments
Physical Inspections
Check the containers
Data Logging and System Integration
Access the data of containers and shipments into the system
Yard Allocation
Specific allocated position for temporary storage
Safety & Security Measures
Monitoring System
24/7 CCTV monitoring with the coverage of a large or wide area
Access Control
Security Personnel
Onsite safety protocols
Traffic management at entrance & exit lanes
Strict access controls to prevent unauthorized entry
Physical Security Barriers
Security fencing and cages
Concrete Jersey Barriers
Retractable Safety Barriers
High-mast Lighting for night-time operations
Interlocking Turnstile Door at entry point for the staff and visitors